Stretham and Clapham High School
Education
2 October 2017
Climate Engineering has been appointed to supply and install the mechanical services installation for the Boiler replacement. The contract encompassed the de-commissioning, strip out and replacement of the 4 existing boilers and associated equipment within the Millennium building plantroom replaced with a new heat exchanger and associated equipment connected to the main Building boiler plantroom via PHX LTHW pipework installed below ground. Water treatment, a new BMS system, electrical works & commissioning & testing.