Bushey Meads School

Bushey Meads School

 

Client: T&B Contractors
Project: Bushey Meads School
Business Sector: Education
Location:  Bushey Hertfordshire

DESCRIPTION OF WORKS

 

Bushey Meads School; A coeducational secondary school and sixth form with academy status located in Bushey, Herts with around 1,200 students attending.

Climate Engineering, working alongside T&B Contractors, Horsley Huber Architects and cost consultants Philip Price and Hookway, have undertaken the latest phased redevelopment to provide new facilities to the school site.

The project consisted of a new extension to the science block and alterations to the existing sixth form wing combined with the delivery of an extensive mechanical services package to a bespoke fit-out. The newly built extension to the science labs and refurbishment to the sixth form wing will help provide the school with facilities to inspire the next generation. Our Scope of works included the design and installation of;

 

  • Heat Recovery Ventilation System
  • New Air Conditioning Systems
  • New Heating System.
  • New HWS Systems
  • New CWS Systems
  • New Drainage Systems
  • Commissioning & Handover

 

The ability to hand over a snag-free space within specified time frames is essential in the delivery of school projects as once operational, it is not possible to re-enter the space and interrupt students to conduct any remedial work.