Pembridge Gardens

Pembridge Gardens

 

Client:    Brennan Group
Project: Pembridge Row
Business Sector: Residential
Location:  Notting Hill Gate – London

 

DESCRIPTION OF M&E WORKS

 

Climate Engineering helped in the design and installation of the mechanical and public health services of each house from inception to delivery. The houses are built to conform to the exacting standards of Code 4 for Sustainable Homes, Secured by Design and have incorporated the design criteria for Lifetime Homes. The houses were externally designed to meet the rigorous planning conditions imposed by the Royal Borough of Kensington and Chelsea.

 

Typical of all inner-city spaces, the site was extraordinarily constrained and to service the demands of the build, a just-in-time supply route to the construction site was operated using a dedicated vehicle to make daily deliveries. A detailed construction traffic plan was produced which allowed the main contractor to manage the delicate interface between Transport for London, the local authority and the project.

 

The construction sequence of a complex build with 100% coverage of an infill site on a busy West London bus route was planned in detail and executed with precision by a highly trained and experienced project team. Designed to meet the demanding requirements of the London market, the standard of quality of design and construction detailing is exceptional.