Wycombe Hospital

Wycombe Hospital

 

Client: T&B
Project: Wycombe Hospital Cath Lab
Business Sector: Healthcare
Location:  High Wycombe

 

DESCRIPTION OF WORKS

 

Climate Engineering, working alongside cost consultant Currie & Brown and RG+P Architects, were appointed to deliver an extensive refurbishment of an existing wing of Wycombe General Hospital to form a new Cardiac Catheter Laboratory and Control Room.

The project consisted of extensive alterations to the existing ground wing and the delivery of mechanical services to a bespoke fit-out. The newly configured wing will provide the local community with the diagnostic imaging equipment used to visualise the arteries and chambers of the heart. Working alongside the specialist healthcare provider, GE Healthcare, our scope of works included the design and installation of;

 

  • Heat Recovery Ventilation System
  • New Air Conditioning Systems
  • New BMS System
  • New HWS Systems
  • New CWS Systems
  • New Drainage Systems
  • Commissioning & Handover

 

The ability to hand over a snag-free space is essential in the delivery of hospital projects as, once operational, it is not possible to re-enter the space and interrupt treatment to conduct any remedial work.