UCL Stanmore

UCL Stanmore

Healthcare

1 March 2019

Climate engineering are delighted to have started works at the prestigious Royal National Orthopaedic Hospital Laboratory refurbishment on behalf of UCL. The project consists of the design and installation of new Air Conditioning, Cat 5, Heat Recovery Ventilation, Fume Extract Ventilation, Cat 5 Water Supplies, Heating & Medical Gas supplies to Specialist equipment.

Vertex

Healthcare

1 November 2018

Climate Engineering are delighted to have had our design approved for the alterations to the exiting heating system serving the research labs at Vertex Abingdon. Now the hard work begins with the installation before the weather turns!

West Middlesex Hospital

Healthcare

15 May 2017

Climate Engineering were awarded the contract for the replacement of the existing air conditioning systems located within the medical gases plantroom.The contract encompassed the careful de-commissioning and removal of the old R22 fan coils and condensing units and replacing them with new Daikin Heat Recovery systems.

Wycombe General Hospital Catheter Laboratory

Healthcare

9 February 2017

Climate Engineering has been appointed to supply and install the mechanical services installation for the refurbishment of the new Catheter Laboratory. The contract encompassed the design, supply and installation of new heat recovery VRV air conditioning, heat recovery ventilation, general ventilation, heating, medical gasses,  mains cold water services, hot water services, drainage, water treatment & commissioning.

 

Recent Tweets

Archives